1) Construction of 5 No. Water Storage tanks
2.) Laying 40 Km Transmision and distribution lines
3) Construction of a 15,500m3/d waste stabilization ponds system for kajiado town.
4.) Construction of the 11.9km Olkejuado Trunk Sewers.
5) Construction of the sub-trunk sewers and Reticulation Sewers in the already densely settled areas of the project area
6.) Extension of the Olkejuado River Trunk Sewer upstream to cover the additional areas next to the airstrip that is currently not settled
but predicted to be settled in the future.
Impacts
The project upon completion will serve the target area with clean, safe, and affordable water
Challenges
Lack of funds to commences the construction works even though the detailed designs are ready