| Start Date | 2024-05-04 |
| Planned End Date | N/A |
| Actual End Date | N/A |
| Contractor | Shix Limited |
| Consultant | N/A |
| Target Areas | People of Gakawa Location |
| Scope of Works | - Laying of 3400m of OD 110mm HDPE PN 10 pipes
- Laying of 2350m of OD 110mm HDPE PN 16 pipes
- Construction of 2 No 5m3 Break Pressure Tanks.
- Installation of washouts and air valves to the existing 7400m pipeline. |
| Impacts | The project will socially and economically benefit 1300 households upon completion. It is a non profit organization whose aim is to provide clean water to locals. It has also provided direct lobor to the locals. Approximately 50 lobourers has been employed by the project |
| Challenges | Slow progress by the contractor citing financial constraints |
| Remarks | The project is at advanced stage of completion with the main pending works being installation of hydraulic features.( airvalves and washout s) |