Groundwater Resources Assessment for Managed Aquifer Recharge and Determination of Radon-222 Concentration within the Nairobi Aquifer System

Project Detail Report

Overview

StatusOngoing
TypeAquifer Restoration
AgencyRegional Centre on Groundwater Resources, Education Training and Research.
ProgramRegional Centre on Groundwater Resources, Education Training and Research.
Progress3.81%

Location Information

CountyKajiado
ConstituencyKajiado West
Ward Keekonyokie
SettingUrban
Coordinates-1.557000, 36.727000

Timeline & Impact

Start Date2023-01-07
Planned End Date2028-01-12
Actual End Date2028-01-12
ContractorN/A
ConsultantFrancis Allen Consulting
Target AreasThe target area is the Nairobi Aquifer Suite. Extensively covering the whole of Nairobi County and its constituencies as well as some parts of the Kajiado, Kiambu and Machakos County that fall within the Nairobi Metropolitan area.
Scope of Works• Undertake a comprehensive groundwater mapping of the Nairobi Metropolitan area. • Undertake groundwater recharge in Nairobi Aquifer Suite covering approximately 3000square kilometers • Develop 3 MAR sites within the suite by drilling 3 injection well inject water • Develop 3 wells to monitor groundwater in the said areas. • Develop 3 above ground storage capacities.
Impacts• Raise the groundwater level by 5% over a period of 10 years • 10% increases borehole siting success rate. • The drilling depths to be reduced by 20% reducing the cost of Drilling • 100% reduction in displacement and land subsidence as a result of aquifer depletion. • 50% reduction of waste water and surface runoff and hence flooding reduction • Improve water quality by 5% through reduced concentration of the contaminant • 100% mapping of NAS in reference to Radon 222 mapping • Job creation under the operation and maintenace
ChallengesSeveral illegal Boreholes making it hard to monitor the groundwater trends in the area post groundwater recharge Source of water for recharge. The surface water is highly contaminated hence may require post treatment to purify the water before injecting.
RemarksThe project is currently under assessment to identify key sites of undertaking the groundwater recharge.

Project Cost

Total Contract Sum (GoK + Foreign)KES 21,800,000.00
GoK Contract SumKES 21,800,000.00
Foreign Contract SumKES 0.00
Cumulative ExpenditureKES 1,700,000.00
Outstanding CostKES 20,100,000.00

Funding Sources

SourceTypeAmount (KES)
Gok Grant 21,800,000.00

Budget Allocations by Fiscal Year

Fiscal YearStageFunding SideAmount (KES)
2023/24 Approved GOK 500,000.00
2024/25 Allocated GOK 3,500,000.00

Beneficiaries

Target Households42,774
Target Population182,849