| Start Date | 2025-01-07 |
| Planned End Date | 2029-01-12 |
| Actual End Date | 2029-01-12 |
| Contractor | N/A |
| Consultant | N/A |
| Target Areas | The Lokitipi Aquiferextent within the Turkana North Constituency |
| Scope of Works | • Undertake hydrogeological and geophysical surveys in Lotikipi Aquifer System
• Drill, construct and equip of borehole, and reticulation
• Collect groundwater samples and analyse
• Undertake the Feasibility Study
• Construct and develop water treatment plants
• Identify MAR sites, and develop injecting wells
• Undertake Environmental baseline survey
• Develop Project inception and operation manual
• Develop Training modules, and organize Workshops and public forum |
| Impacts | • Improved availability of water for domestic uses
• Increased food production and nutrition status in the area
• Improved water for schools and hospitals
• Mitigation of conflicts
• Increased water availability for livestock and Industrial use
• Minimized Water borne diseases
• Flood control
• Enhanced environmental protection |
| Challenges | • Risk of delayed disbursement by development partners
• Unreliable bore hole data records |
| Remarks | The project is awaiting approval by National Treasury |