| Start Date | 2023-05-04 |
| Planned End Date | N/A |
| Actual End Date | 2025-05-09 |
| Contractor | Afriscape Contractors |
| Consultant | N/A |
| Target Areas | Kapua secondary school, Kapua Dispensary and community |
| Scope of Works | Connecting water from existing borehole approximately 3km and installation of storage tanks (Total capacity 40 cubic meters) and installation of communal water points |
| Impacts | School enrolment increased, better health care, enviroment improved by tree planting, residents close access to water point |
| Challenges | High demand versus low supply |
| Remarks | The borehole that was drilled initially was found to be dry. Connectrion from existing boerehole completed and operational |