Lot 2 - Construction of the Western Transmission ( Kabete - Uthiru - Karen ) pipeline.

Project Detail Report

Overview

StatusOngoing
TypeWater Supply
AgencyAthi Water Works Development Agency
ProgramNairobi City Water Distribution Network Modifications Project
Progress1.00%

Location Information

CountyKiambu
ConstituencyKabete
WardUthiru
SettingUrban
Coordinates-1.223271, 36.712619

Timeline & Impact

Start DateN/A
Planned End DateN/A
Actual End DateN/A
ContractorZhongmei Engineering Group Limited
ConsultantCES in joint venture with MIBP
Target AreasUthiru
Scope of WorksConstruction of 14.25 km of water pipeline from Kabete to Uthiru to Karen. Construction of a 5000m3 reinforced water storage tank at Uthiru. Increasing the capacity of the Kabete–Uthiru Pumping System from 30,000 m³/day to 72,000 m³/day
Impacts1. Meet water requirements of Western and South-Western Nairobi 2. Transmit 72,656m3/d of water to serve a target population of 622,590 in the region.
Challenges1. Delay in Wayleave Acqusion and Handing over of some Sites to Contractor 2. Delay in Mobilization and Procurement of Steel Pipes and fittings by Contractor 3. Cash flow constraints due to delays in disbursement of certified payments 4. Delayed relocation of electrical power lines along part of the pipeline route 5. Working within limited Wayleave in highly congested and densely populated areas.
Remarks1. NCWSC should regulary patrol and inspect the pipeline to avoid installation of illegal connections. 2. In future projects, acquisition of Wayleaves, and Relocation of services agreements to be finalized before commencement of works. 3. NCWSC to adopt and adhere to a maintenance and operational schedule.

Project Cost

Total Contract Sum (GoK + Foreign)KES 56,163,287.17
GoK Contract SumKES 8,424,493.50
Foreign Contract SumKES 47,738,793.67
Cumulative ExpenditureKES 56,163,287.17
Outstanding CostKES 0.00

Funding Sources

SourceTypeAmount (KES)
Gok Grant 8,424,493.50

Beneficiaries

Target Households4,706
Target Population23,531