| Start Date | N/A |
| Planned End Date | 2024-08-07 |
| Actual End Date | N/A |
| Contractor | Zhongmei Engineering Group Limited |
| Consultant | Frame Consultants limited and Ditech Engineering |
| Target Areas | Nairobi city |
| Scope of Works | Rehabilitation of existing DEWwTP inlet works. Duplication of the DEWWTP inlet works. Desludging of the Anaerobic ponds. Constuuction and equipping of control room |
| Impacts | Reduce pollution on Nairobi rivers. Restore Nairobi rivers. Contribute to improved health and
quality of life through provision
of safe and sustainable water and
sewerage services. |
| Challenges | Delays in dsibursment of pending VAT components Safety concerns to theloclas due to wild animals emerging from the ponds. Vanddalism of the constructed works. |
| Remarks | There should be follow up with NT to disburse pending VAT components to the contrator. AWWDA should increase cooperation with KWS to find a solution on wild animals. Local admisnstaration should streamline a community sentization on the impact of the project with an aim of embracing the project instead of vandalilzing them. |