| Start Date | 2025-03-05 |
| Planned End Date | 2025-09-05 |
| Actual End Date | N/A |
| Contractor | Sumin Tech (k) Limited |
| Consultant | No |
| Target Areas | Kibisi,
Lunyu,
Nabiswa,
Musembe |
| Scope of Works | Rehabilitation of 2no. 100m3 masonry sumps
Electromechanical works and fencing works
Rising main from the pump house to masonry tank and steel tank (2000m length) 110mm dia
Rehabilitation of 1nr. Masonry 150m3 tank and 1nr. 50m3 elevated steel tank
Return line to Esirulo dispensary 600m length (OD 50mm diameter HDPE)
Construction of 1no.normal water kiosk at Esirulo market
Construction of 5nr communal water points
Line to Esirulo primary/secondary/ Isanda primary 1500m length (OD 90mm-od 63 mm diameter HDPE)
Line to esirulo market 1300m length (OD 140mm-63mm diameter HDPE)
Line to Mwiyavo market 700m length (OD 50mm diameter HDPE)
Line to Ikalikha primary 1000m length (63mm diameter HDPE) |
| Impacts | Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities |
| Challenges | Late disbursement of funds |
| Remarks | project yet to start |