Kimanich-Kapsowar Chesoi Water Project

Project Detail Report

Overview

StatusCompleted
TypeRiver Intake
AgencyNorth Rift Valley Water Works Developmnet Agency
ProgramWater Harvesting Program
Progress100.00%

Location Information

CountyElgeyo-Marakwet
ConstituencyMarakwet West
WardKapsowar
SettingUrban
Coordinates,

Timeline & Impact

Start Date2023-11-10
Planned End Date2024-11-10
Actual End Date2024-11-10
ContractorN/A
ConsultantMIBP Limited
Target AreasKapsowar, Kapsumai and Sisiya
Scope of WorksIntake Works on Arror River Raw Water Gravity Main (Diameter 400, length 4.53Km) Water Treatment Works (capacity 5,360m3/d), Treated Water Transmission Mains consisting of the following: • Kapsowar Gravity Main (Diameter 250 – 315, length 14.28km) from the Water Treatment Works to Arror Pumping Station with enroute offtakes, • Arror Rising Main (Diameter 225, Length 0.95km) from Arror Pumphouse to the Proposed Kapsowar Storage Tank; • Chesoi Gravity Main (Diameter 140, length 2.1km) • Maina Gravity Offtake (Diameter 110, length 4.53km) • Metipsoo Gravity Offtake (Diameter 75, length 0.3km) • Kipsaiya Gravity Offtake (Diameter 125, length 1.22km) • Kapsumai Gravity Main (Diameter 140, length 5.59km) from the Proposed Kapsowar Storage Tank to the Proposed Sinon Storage Tank / Pumping Station; • Kapsumai Rising Main (Diameter 125, length 2.64km) • Diameter140, , 589m long Rising Main to Kapsicha Storage Tank from the Treatment Works; v) 12 Nr. Storage Reservoirs to be supplied via offtakes from the Treated Water Transmission Main (capacities varying from 100m3 - 1000m3); vi) Distribution Mains from the Storage Tanks (HDPE pipes, diameters varying from Diameter 50 to 160 – approximately 63.13km vii) 9 Nr. Break Pressure Tanks (capacities ranging from (5m3 – 50m3) viii) Rehabilitation of 3Nr. Existing Water Supply Systems (Kapsowar, Koibatek and Sambirir Water Supply Systems)
ImpactsIncreased water coverage Improved Quality of Life Reduction in Waterborne Diseases Better Hygiene and Sanitation Increased Productivity Community Cohesion Reforestation and Soil Conservation Reduced instances of water bornes diseases
ChallengesN/A
RemarksDesign phase complete Awaiting OFID funding approval The resources required for implementation: Ksh. 2,5000,000,000.00

Project Cost

Total Contract Sum (GoK + Foreign)KES 15,494,515.00
GoK Contract SumKES 15,494,515.00
Foreign Contract SumKES 0.00
Cumulative ExpenditureKES 0.00
Outstanding CostKES 0.00

Funding Sources

SourceTypeAmount (KES)
Gok Grant 25,000,000.00

Budget Allocations by Fiscal Year

Fiscal YearStageFunding SideAmount (KES)
2023/24 Approved GOK 30,000,000.00

Beneficiaries

Target Households5,229