Rehabilitation, Augmentation, and Construction of Ndengelwa, Sikata, State Lodge, Kanduyi, and Makutano Water Supply and Sewerage Project.

Project Detail Report

Overview

StatusCompleted
TypeWater Supply
AgencyLake Victoria North Water Works Development Agency
ProgramGOK Funded Projects
Progress100.00%

Location Information

CountyBungoma
ConstituencyKanduyi
WardTownship
SettingUrban
Coordinates,

Timeline & Impact

Start Date2024-03-01
Planned End DateN/A
Actual End DateN/A
ContractorTsavo Merchant Ltd, Blueshift Tsavo Merchants Ltd and Hydrotech Associates Ltd
ConsultantN/A
Target AreasTownship
Scope of WorksMabanga chamber- Sikata road pipeline (3,400m long,225mm diameter HDPE) Makutano at Kanduyi junction to airstrip pipeline (2900m long 110mm and 300m long on 90mmdiameter HDPE from elevated tank to stadium) airstrip pipeline to state lodge (600m long 110mm diameter HDPE) pipeline to Makutano primary school tanks (600m long 90mm diameter HDPE) sewer line- state lodge to Bungoma High School, manhole supply and installation of 2 no. 100m3 elevated structurally pressed steel pressed tanks on steel towers borehole drilling works finishing works for the borehole drilling installation of solar power hybrid system, solar flood light, and submersible pump installation of 50m3 (50,000litres) pressed elevated steel tank on 8m steel tower rising main from the borehole to elevated tank (30m length) 40mm dia distribution line from the tank chamber (100m long) HDPE 90mm-50mm dia
ImpactsReduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
ChallengesInsufficient budget allocation which led to delays and limitations in scope. Late disbursement of project funds
RemarksProject complete and operational

Project Cost

Total Contract Sum (GoK + Foreign)KES 173,240,100.00
GoK Contract SumKES 173,240,100.00
Foreign Contract SumKES 0.00
Cumulative ExpenditureKES 150,415,945.40
Outstanding CostKES 11,301,264.45

Funding Sources

SourceTypeAmount (KES)
Gok Grant 163,000,000.00

Budget Allocations by Fiscal Year

Fiscal YearStageFunding SideAmount (KES)
2023/24 Approved GOK 163,000,000.00

Beneficiaries

Target Households18,750
Target Population75,000