| Start Date | N/A |
| Planned End Date | N/A |
| Actual End Date | N/A |
| Contractor | Afriscape Limited |
| Consultant | N/A |
| Target Areas | Mogogosiek, Litein, Kapkatet, Kaplong, Kapletundo |
| Scope of Works | 1.Replacement of the Asbestos roofing materials of the low lift pump house
2.Rehabilitation of electrical works
3.Supply & installation of 2 no. low lift end suction centrifugal pumps discharging 220 m3 at 30 m TDH
4. Supply & installation of 5 no. high lift centrifugal pumps discharging 220 m3 at 160 m TDH |
| Impacts | Optimise water production to design capacity; Improve reliability of water supply; Reduce waterborne diseases |
| Challenges | Delayed disbursements; Lengthy logistical challenges during shipments for pumps |
| Remarks | ongoing |