| Start Date | N/A |
| Planned End Date | N/A |
| Actual End Date | 2023-01-06 |
| Contractor | Nanchang Foreign Engineering Co. (K) Ltd & Jiangxi Jingtai Water Conservancy & Electric Power Construction JV |
| Consultant | CES/MIBP |
| Target Areas | Kapsuser |
| Scope of Works | Reinforced Concrete Intake Structure on River Kimugu
Raw Water Gravity Main: DN 600mm, 7.7km Steel pipe
Kimugu Water Treatment Plant of capacity 13,000m3/day
Treated Water Gravity Main from Kimugu WTP to the existing Tea Hotel Tanks: DN 600mm, 2.8km HDPE pipe
Treated Water Pumping Main from Kimugu WTP to New Kapchetoror Tank: DN 250mm, 4.6km Steel pipe
1,000m3 capacity New Kapchetoror Storage Tank (Reinforced Concrete) at Timbilil Treatment Plant, Total storage capacity-6000m3
Distribution Mains - HDPE pipe varying in diameter from 90mm to 300mm, approximate total length 50km. |
| Impacts | Access to clean potable Water Reduced water borne diseases; 200 people employed during construction Reduced water borne disease |
| Challenges | Delay in obtaining the exemption master list, changes in design due to escalation in the price of steel, delayed payments and effects of COVID 19 in the execution of the works. |
| Remarks | Sustantially complete |