Rehabilitation And Expansion Of Ogembo Water Supply System In Kisii County:

Project Detail Report

Overview

StatusOngoing
TypeRiver and Spring
AgencyLake Victoria South Water Works Development Agency
ProgramGOK Funded Projects
Progress18.00%

Location Information

CountyKisii
ConstituencyBobasi
WardMasige West Ward
SettingUrban
Coordinates-0.796450, 34.722044

Timeline & Impact

Start DateN/A
Planned End DateN/A
Actual End DateN/A
ContractorFatah Construction & Civil Works Limited
ConsultantN/A
Target AreasOgembo Town, Orogare
Scope of Worksa) Spring Intake and Water Infrastructure • Spring intake works at Mosorora Springs • Construction of 50m³ masonry sump tank • Electro-mechanical works: • 1 High Lift Pump (Q = 20m³/hr) • 54 Solar PV Modules (535W) on steel structure b) Ancillary Works at Mosorora Springs • Micro-tunneling for road crossing • Construction of Mosorora Spring access road • Construction of guard house • Sanitation facility (1-door latrine and 1-door bathroom) • Installation of chlorine dozing tank (500ml capacity) • Fencing of the pumping station c) Pipelines Related to Mosorora/Orogare • Rising main from Mosorora Spring to Orogare Tank: • PN25, OD110 HDPE, 1.2 km • Distribution mains in Orogare: • HDPE pipes OD110–50mm, 6.14 km • Rehabilitation of existing break pressure tank (BPT) • 100m³ galvanized steel tank at Orogare on a 6m tower • Fencing at tank site (60m)
ImpactsImprove reliability of safe, treated and reliable water. Reduce waterborne diseases
ChallengesDelayed disbursements of funds
RemarksProject is ongoing with construction of the intake on River Kabianga

Project Cost

Total Contract Sum (GoK + Foreign)KES 41,598,593.40
GoK Contract SumKES 41,598,593.40
Foreign Contract SumKES 0.00
Cumulative ExpenditureKES 0.00
Outstanding CostKES 41,598,593.40

Funding Sources

SourceTypeAmount (KES)
Gok Grant 41,598,593.40

Beneficiaries

Target Households5,300
Target Population21,200