| Start Date | 2021-10-02 |
| Planned End Date | N/A |
| Actual End Date | N/A |
| Contractor | Blue Swift Contractors Limited |
| Consultant | Design Master Plan in JV with Studio Galli Ingegnera (SGI) |
| Target Areas | N/A |
| Scope of Works | Watamu Town
50mm diameter to 200mm diameter HDPE and Ferrous Water Pipelines, approx. total length 21km.
Supply of Pipes and Fittings for approximately 700 Consumer Water Connections to be carried out by the Water Company.
Reconnection of Existing Consumers previously connected to old water mains to the New Distribution Network – approximately 300 Consumers. |
| Impacts | >Protection of public health >Environmental preservation (through a Managed water supply system) >Access to Education for girls > Economic benefits from employment (operation and maintenance staff) >Healthy and sustainable community due to improved quality of life (through more comfortable and dignified living environment) >Revenue generation from the water bills payments |
| Challenges | >Cash flow challenges due to extended disbursement procedures |
| Remarks | Physical works completed
DLP ended on 30th December 2024
Project operational |