| Scope of Works | 1. Extension of water supply to Kabartonjo, Kaptorokwo, Kabasis, Kituro and Kapkut. | The total length of pipeline to constructed is 47km. . | 2. Sewerage system to serve Kabarnet Town CBD comprising of 7km trunk main and | Waste Water Treatment plant of capacity 3000m3/d) | 3. Enlargement of spillway and draw off system for the Dam. | 4. Construction of 16 No.silt traps along the rivers | 5. Purchase and installation of Dam electrical and instrumentation equipments. | 6. Construction of a hydro power Generation System. | 7. Rehabilitation of the WSP Offices for utilization by Kirandich Water Company | 8. Construction of storage tanks with Capacities ranging from 100m3 to 200m3. |