Report Back to Projects
Ongoing Pipeline extension Approved

Kapkwen Pipeline Ext

Bomet · Chepalungu · Nyangores

Overall Progress
80.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Water Supply and Sanitation for the Urban Poor -KfW-Phase IV
Start Date
04 Jun 2022
Planned End
04 Jun 2023
Actual End
-
Contractor
Maxfol, Aquawet ltd, Kendi limited
Consultant
None
Location Type
Urban
Target Areas
Kapkwen
Scope of Works
• Construction of 1no closed kiosk • Construction of 1no. insitu yard taps • 161 no. Cold Water Consumer meters • 9.4 km Pipeline extension • Construction of 1 no. 108 m3 elevated steel tank • 75m3/hr Discharge Electric Pump set
Impacts
The project will improve water access for 5,408 people through a 9.4 km pipeline extension, 161 cold water consumer meters for efficient distribution, a 108m³ elevated steel tank for reliable storage, a 75m³/hr discharge electric pump set to enhance supply, and the construction of a closed kiosk and an in-situ yard tap for improved public access.
Key Challenges
Slow release GOK funds, Slow pace of construction
GPS Coordinates
-0.7865383 35.2994394
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 3.2M
Kfw
🌍 Foreign · Grant
KES 16.7M
Total KES 19.9M
Beneficiaries
1,082
Households
5,408
Population
Technical Specs
Storage Reservoir 113.00 m³
Treated Water Mains 9.40 km
Distribution Lines 9.40 km
Water Kiosks 1
Connections 161