Proposed
Borehole
Approved
Olturot/Oltorot
Marsabit · Laisamis · Loiyangalani
Overall Progress
0.00%
Project Overview
Implementing Agency
Water Sector Trust Fund
Programme
Horn of Africa -Ground Water for resillience Programme (HOAGWR)
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
CAS
Location Type
Rural
Target Areas
olturot
Scope of Works
3No Solar Photovoltaic Pumping (PVP) System for Laisamis, Manyatta Lengima and Olturot Boreholes.
Supply and installation of 41.125 km of various HDPE Pipeline sizes ranging from OD 50mm to 150mm and pressure rating as detailed
Construction of separate community water point for livestock and domestic as given in the specifications.
Construction/supply and installation of various sizes of Water Tanks
Ancillary Works - Construction of Administration buildings, Pump House Control room, guard house and sanitation facilities as detailed
Impacts
To serve the estimated population. Specific to be updated
Remarks
Project at the design stage
GPS Coordinates
2.592309
37.08502
Funding Sources
Wb
🌍 Foreign
· Loan
KES 31.5M
Total
KES 31.5M
Beneficiaries
0
Households
2,227
Population
Technical Specs
Storage Reservoir
100.00 m³
Distribution Lines
12.27 km
Water Kiosks
3
Connections
10