Report Back to Projects
Ongoing Unknown Approved

Kirandich Dam Phase II Water Supply Project

Baringo · Baringo Central · Kabarnet

Overall Progress
25.19%
Project Overview
Implementing Agency
Central Rift Valley Water Works Development Agency
Programme
Kirandich Dam Phase II Water Supply Project
Start Date
02 Jun 2017
Planned End
12 Aug 2018
Actual End
-
Contractor
COSPIN srl, in JV with Nurovi srl and Idroesse engineering srl,
Consultant
SWS SRL IN JOINT VENTURE WITH HYDEA SPA
Location Type
Rural Urban
Target Areas
Baringo Central and Baringo North Sub-counties
Scope of Works
1. Extension of water supply to Kabartonjo, Kaptorokwo, Kabasis, Kituro and Kapkut. The total length of pipeline to constructed is 47km. . 2. Sewerage system to serve Kabarnet Town CBD comprising of 7km trunk main and Waste Water Treatment plant of capacity 3000m3/d) 3. Enlargement of spillway and draw off system for the Dam. 4. Construction of 16 No.silt traps along the rivers 5. Purchase and installation of Dam electrical and instrumentation equipments. 6. Construction of a hydro power Generation System. 7. Rehabilitation of the WSP Offices for utilization by Kirandich Water Company 8. Construction of storage tanks with Capacities ranging from 100m3 to 200m3.
Impacts
Improve access to water
Key Challenges
Delay in wayleave acquisition for the sewer lines
Remarks
IPC No.2 has been processed and awaiting payment. IPC.No 3 is under review by the client. Master list has been approved and contractor is working on the tax exemption for goods and services.
GPS Coordinates
0.498226, 35.782769
Funding Sources
Italy
🌍 Foreign · Loan
KES 2,197.8M
Total KES 2,197.8M
Beneficiaries
12,000
Households
60,000
Population
Technical Specs
Volume Abstracted 14,000.00 m³/day
Treatment Capacity 14,000.00 m³/day
Storage Reservoir 4.00 m³
Treated Water Mains 47.00 km
Wastewater Production Capacity 2,000.00 m³/day
Wastewater Treatment Capacity 3,000.00 m³/day
Trunk Sewer Main 7.00 km
Reticulation Sewer 16.00 km