Completed
Borehole
Approved
Kapua Secondary School Borehole
Turkana · Turkana Central · Kalokol
Overall Progress
100.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
Water for Schools
Start Date
04 May 2023
Planned End
-
Actual End
09 May 2025
Contractor
Afriscape Contractors
Consultant
-
Location Type
Rural
Target Areas
Kapua secondary school, Kapua Dispensary and community
Scope of Works
Connecting water from existing borehole approximately 3km and installation of storage tanks (Total capacity 40 cubic meters) and installation of communal water points
Impacts
School enrolment increased, better health care, enviroment improved by tree planting, residents close access to water point
Key Challenges
High demand versus low supply
Remarks
The borehole that was drilled initially was found to be dry. Connectrion from existing boerehole completed and operational
GPS Coordinates
3.23'59.90''N 35.36'59.11''E
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 10.0M
Total
KES 10.0M
Beneficiaries
400
Households
2,000
Population
Technical Specs
Volume Abstracted
40.00 m³/day
Storage Reservoir
30.00 m³
Distribution Lines
3.00 km
Water Kiosks
4