Report Back to Projects
Ongoing Waste Water Treatment Approved

Lot 1 Construction of Dandora Estate Wastewater treatment plant-Rehabilitation and duplication of plant inlet works

Nairobi · Kasarani · Ruai, Njiru, Kasarani

Overall Progress
84.00%
Project Overview
Implementing Agency
Athi Water Works Development Agency
Programme
Nairobi Rivers Basin Rehabilitation and Restoration Program: Sewerage Improvement Project Phase II
Start Date
-
Planned End
07 Aug 2024
Actual End
-
Contractor
Zhongmei Engineering Group Limited
Consultant
Frame Consultants limited and Ditech Engineering
Location Type
Urban
Target Areas
Nairobi city
Scope of Works
Rehabilitation of existing DEWwTP inlet works. Duplication of the DEWWTP inlet works. Desludging of the Anaerobic ponds. Constuuction and equipping of control room
Impacts
Reduce pollution on Nairobi rivers. Restore Nairobi rivers. Contribute to improved health and quality of life through provision of safe and sustainable water and sewerage services.
Key Challenges
Delays in dsibursment of pending VAT components Safety concerns to theloclas due to wild animals emerging from the ponds. Vanddalism of the constructed works.
Remarks
There should be follow up with NT to disburse pending VAT components to the contrator. AWWDA should increase cooperation with KWS to find a solution on wild animals. Local admisnstaration should streamline a community sentization on the impact of the project with an aim of embracing the project instead of vandalilzing them.
GPS Coordinates
1.3152°S, 36.9380°E
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 55.1M
Adb
🌍 Foreign · Loan
KES 289.3M
Total KES 344.4M
Beneficiaries
41,088
Households
205,439
Population
Technical Specs
Connections 26,180
Wastewater Production Capacity 76,435.30 m³/day
Wastewater Treatment Capacity 160,000.00 m³/day
Non-Sewered Sanitation Facilities 1
Sewer Connections (Households) 41,087
Created 16 Aug 2026, 15:51 · Last updated 16 Aug 2026, 17:18
County Overview
Loading…
Loading…

Fetching entity performance details…