Completed Water Supply Approved

Rehabilitation, Augmentation, and Construction of Ndengelwa, Sikata, State Lodge, Kanduyi, and Makutano Water Supply and Sewerage Project.

Bungoma · Kanduyi · Township

Overall Progress
100.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Lake Victoria North WWDA Projects.
Start Date
01 Mar 2024
Planned End
-
Actual End
-
Contractor
Tsavo Merchant Ltd, Blueshift Tsavo Merchants Ltd and Hydrotech Associates Ltd
Consultant
-
Location Type
Urban
Target Areas
Township
Scope of Works
mabanga chamber- sikata road pipeline (3,400m long,225mm diameter HDPE) makutano at kanduyi junction to airstrip pipeline (2900m long 110mm and 300m long on 90mmdiameter HDPE from elevated tank to stadium) airstrip pipeline to state lodge (600m long 110mm diameter HDPE) pipeline to Makutano primary school tanks (600m long 90mm diameter HDPE) sewer line- state lodge to Bungoma High School manhole supply and installation of 2 no. 100m3 elevated structurally pressed steel tanks on steel towers borehole drilling works finishing works for the borehole drilling installation of solar power hybrid system, solar flood light, and submersible pump installation of 50m3 (50,000litres) pressed elevated steel tank on 8m steel tower rising main from the borehole to elevated tank (30m length) 40mm dia distribution line from the tank chamber (100m long) HDPE 90mm-50mm dia
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Insufficient budget allocation which led to delays and limitations in scope. Late disbursement of project funds
Remarks
Project complete and operational
GPS Coordinates
Latitude : 0.57470192 Longitude 34.559109472
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 163.0M
Total KES 163.0M
Beneficiaries
18,750
Households
75,000
Population
Technical Specs
Volume Abstracted 4,500.00 m³/day
Treatment Capacity 4,500.00 m³/day
Storage Reservoir 250.00 m³
Treated Water Mains 0.03 km
Distribution Lines 7.60 km
Connections 3
Wastewater Production Capacity 4,500.00 m³/day
Wastewater Treatment Capacity 4,500.00 m³/day
Trunk Sewer Main 2.00 km
Reticulation Sewer 0.20 km
Manholes 188
Non-Sewered Sanitation Facilities 200
Sewer Connections (Households) 2