Report Back to Projects
Ongoing Borehole Approved

Khukolomani Health Centre Borehole Water project

Kakamega · Khwisero · Kisa North

Overall Progress
70.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Cross-County Programme
Start Date
10 Dec 2024
Planned End
10 Jun 2025
Actual End
-
Contractor
Hapex contractors limited & M/s Joyrowl Limited
Consultant
-
Location Type
Rural
Target Areas
Khukholomani
Scope of Works
Installation of solar power hybrid system, solar flood light, and submersible pump supply and installation of 30m³ elevated structurally pressed steel tank on 10m steel tower rising main from the borehole to elevated tank (500m length) 40mm dia distribution line from the tank chamber (1600m long) hdpe 50mm-32mm dia construction of 4nr communal water points standard water kiosk
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Insufficient budget allocation and late disbursement of project funds which led to delays
Remarks
Slow progress of the project
GPS Coordinates
Latitude 0.1391008992 Longitude 34.53845982
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 10.0M
Total KES 10.0M
Beneficiaries
375
Households
1,500
Population
Technical Specs
Volume Abstracted 48.00 m³/day
Treatment Capacity 48.00 m³/day
Storage Reservoir 30.00 m³
Treated Water Mains 0.50 km
Distribution Lines 1.60 km
Water Kiosks 5