Report Back to Projects
Proposed Water Supply Approved

Rehabilitation and Augumentation of Kapanga-Kibisi-Lunyu-Nabiswa-Cluster Water Project

Bungoma · Tongaren · Mbakalo

Overall Progress
0.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Lake Victoria North WWDA Projects.
Start Date
05 Mar 2025
Planned End
05 Sep 2025
Actual End
-
Contractor
Sumin Tech (k) Limited
Consultant
No
Location Type
Rural
Target Areas
Kibisi, Lunyu, Nabiswa, Musembe
Scope of Works
Rehabilitation of 2no. 100m3 masonry sumps Electromechanical works and fencing works Rising main from the pump house to masonry tank and steel tank (2000m length) 110mm dia Rehabilitation of 1nr. Masonry 150m3 tank and 1nr. 50m3 elevated steel tank Return line to Esirulo dispensary 600m length (OD 50mm diameter HDPE) Construction of 1no.normal water kiosk at Esirulo market Construction of 5nr communal water points Line to Esirulo primary/secondary/ Isanda primary 1500m length (OD 90mm-od 63 mm diameter HDPE) Line to esirulo market 1300m length (OD 140mm-63mm diameter HDPE) Line to Mwiyavo market 700m length (OD 50mm diameter HDPE) Line to Ikalikha primary 1000m length (63mm diameter HDPE)
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Late disbursement of funds
Remarks
project yet to start
GPS Coordinates
Latitude 0.671213487694 Longitude 34.8479723185
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 20.0M
Total KES 20.0M
Beneficiaries
2,989
Households
11,956
Population
Technical Specs
Volume Abstracted 384.00 m³/day
Treatment Capacity 384.00 m³/day
Storage Reservoir 200.00 m³
Treated Water Mains 2.00 km
Distribution Lines 5.30 km
Water Kiosks 6
Connections 10
Created 16 Aug 2026, 15:51