Report Back to Projects
Ongoing Borehole Approved

Etenje Primary School

Kakamega · Mumias West · Etenje

Overall Progress
30.00%
Project Overview
Implementing Agency
Lake Victoria North Water Works Development Agency
Programme
Water for Schools
Start Date
11 Apr 2024
Planned End
11 Oct 2024
Actual End
-
Contractor
Amtaf Investment Ltd
Consultant
-
Location Type
-
Target Areas
Etenje
Scope of Works
Drilling, Installation of solar power hybrid system, solar floodlight and submersible pump Supply and installation of 18m³ elevated structurally pressed steel tank on 10m steel tower Rising main from the borehole to elevated tank (100m length) 40mm dia Construction of 3nr communal water points Distribution line from the tank to cwp2 (130m long) 40mm-32mm dia
Impacts
Reduction in waterborne diseases due to access to clean water and improved sanitation, leading to better overall health and reduced healthcare costs. Increased school attendance especially for girls as they spend less time collecting water and managing sanitation needs. Access to clean water and sanitation will increase productivity in the workforce, leading to improved livelihoods and economic growth, women and girls often bear the burden of collecting water, so improved water access will empower them and provide more time for other activities
Key Challenges
Insufficient budget allocation which led to delays and limitations in scope and late disbursement of funds
Remarks
Slow progress
GPS Coordinates
Latitude 0.26362602 Longitude 34.44563024
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 8.0M
Total KES 8.0M
Beneficiaries
500
Households
2,000
Population
Technical Specs
Volume Abstracted 27.00 m³/day
Treatment Capacity 21.60 m³/day
Storage Reservoir 18.00 m³
Treated Water Mains 0.10 km
Distribution Lines 0.13 km
Water Kiosks 3
Created 16 Aug 2026, 15:51 · Last updated 16 Aug 2026, 17:19
County Overview
Loading…
Loading…

Fetching entity performance details…