Report Back to Projects
Completed River Intake Approved

Liter-Cheptulel Water Supply Project

West pokot · Sigor · Lomut

Overall Progress
100.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
GOK Funded Projects
Start Date
-
Planned End
-
Actual End
-
Contractor
Hampton Construction Limited
Consultant
-
Location Type
Rural
Target Areas
Cheptulel TTI Cheptulel Boys Secondary Kokwombeses Secondary Cheptulel Girls Secondary Cheptule Primary Arpollo Primary Sapulmoi Primary Chemaley Primary Kosilot Primary Cheptulel Shoppping Centre Administrative areas
Scope of Works
1. Intake works; 2. Gravity Main Pipeline – 2.50 Km a) 4" dia Galvanized Iron Class B Section – 1.00 Km b) HDPE Diameter 110 mm – 1.50 Km 3. Distribution Pipelines a) Ksaa -TTI Tank Pipeline (1 Km long 3" GI Pipe) b) TTI line (0.8 Km long Diameter 63 mm) c) Cheptulel Primary Line (2.2 Km long Diameter 75 mm) 4. Rehabilitation of existing 3 No. Masonry Tanks 5. Construct a 2 m3 Break Pressure Tank 6. Other Civil Works
Impacts
Improved security status across the two communities Improved access to water Cheptulel is now more habitable as evidenced by improved settlement increasing land productivity and enhanced livelihoods Re-opening of closed schools
Key Challenges
Insecurity within the project area Difficult terrain
Remarks
The project is complete and operational Request for additional funds to implement phase II of the project
GPS Coordinates
latitudes 1.287° to 1.303° longitudes 35.59° to 35.62°
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 30.0M
Total KES 30.0M
Beneficiaries
3,000
Households
15,000
Population
Technical Specs
Volume Abstracted 1,500.00 m³/day
Storage Reservoir 100.00 m³
Treated Water Mains 3.50 km
Distribution Lines 3.00 km
Connections 50
Non-Sewered Sanitation Facilities 2
Created 16 Aug 2026, 17:18