Completed River Intake Approved

Kimanich-Kapsowar Chesoi Water Project

Elgeyo-Marakwet · Marakwet West · Kapsowar

Overall Progress
100.00%
Project Overview
Implementing Agency
North Rift Valley Water Works Developmnet Agency
Programme
Water Harvesting Program
Start Date
10 Nov 2023
Planned End
10 Nov 2024
Actual End
10 Nov 2024
Contractor
-
Consultant
MIBP Limited
Location Type
Rural Urban
Target Areas
Kapsowar, Kapsumai and Sisiya
Scope of Works
Intake Works on Arror River Raw Water Gravity Main (Diameter 400, length 4.53Km) Water Treatment Works (capacity 5,360m3/d), Treated Water Transmission Mains consisting of the following: • Kapsowar Gravity Main (Diameter 250 – 315, length 14.28km) from the Water Treatment Works to Arror Pumping Station with enroute offtakes, • Arror Rising Main (Diameter 225, Length 0.95km) from Arror Pumphouse to the Proposed Kapsowar Storage Tank; • Chesoi Gravity Main (Diameter 140, length 2.1km) • Maina Gravity Offtake (Diameter 110, length 4.53km) • Metipsoo Gravity Offtake (Diameter 75, length 0.3km) • Kipsaiya Gravity Offtake (Diameter 125, length 1.22km) • Kapsumai Gravity Main (Diameter 140, length 5.59km) from the Proposed Kapsowar Storage Tank to the Proposed Sinon Storage Tank / Pumping Station; • Kapsumai Rising Main (Diameter 125, length 2.64km) • Diameter140, , 589m long Rising Main to Kapsicha Storage Tank from the Treatment Works; v) 12 Nr. Storage Reservoirs to be supplied via offtakes from the Treated Water Transmission Main (capacities varying from 100m3 - 1000m3); vi) Distribution Mains from the Storage Tanks (HDPE pipes, diameters varying from Diameter 50 to 160 – approximately 63.13km vii) 9 Nr. Break Pressure Tanks (capacities ranging from (5m3 – 50m3) viii) Rehabilitation of 3Nr. Existing Water Supply Systems (Kapsowar, Koibatek and Sambirir Water Supply Systems)
Impacts
Increased water coverage Improved Quality of Life Reduction in Waterborne Diseases Better Hygiene and Sanitation Increased Productivity Community Cohesion Reforestation and Soil Conservation Reduced instances of water bornes diseases
Remarks
Design phase complete Awaiting OFID funding approval The resources required for implementation: Ksh. 2,5000,000,000.00
GPS Coordinates
latitudes 0°56'50.43" N longitudes 35° 30'30.73"
Funding Sources
Gok
🇰🇪 Domestic · Grant
KES 25.0M
Total KES 25.0M
Beneficiaries
5,229
Households
23,529
Population
Technical Specs
Storage Reservoir 1,850.00 m³
Treated Water Mains 16.00 km
Distribution Lines 34.95 km
Water Kiosks 30
Connections 750
Non-Sewered Sanitation Facilities 10