Ongoing
River Intake
Approved
Rehabilitation of electromechanical works for Itare water supply system
Bomet · Konoin · Mogogosiek
Overall Progress
80.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
GOK Funded Projects
Start Date
-
Planned End
-
Actual End
-
Contractor
Afriscape Limited
Consultant
-
Location Type
Rural
Target Areas
Mogogosiek, Litein, Kapkatet, Kaplong, Kapletundo
Scope of Works
1.Replacement of the Asbestos roofing materials of the low lift pump house
2.Rehabilitation of electrical works
3.Supply & installation of 2 no. low lift end suction centrifugal pumps discharging 220 m3 at 30 m TDH
4. Supply & installation of 5 no. high lift centrifugal pumps discharging 220 m3 at 160 m TDH
Impacts
Optimise water production to design capacity; Improve reliability of water supply; Reduce waterborne diseases
Key Challenges
Delayed disbursements; Lengthy logistical challenges during shipments for pumps
Remarks
ongoing
GPS Coordinates
0°36'22.37"S, 35°17'21.26"E
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 50.0M
Total
KES 50.0M
Beneficiaries
28,000
Households
140,000
Population
Technical Specs
Volume Abstracted
8,000.00 m³/day
Treatment Capacity
8,000.00 m³/day
Storage Reservoir
3,640.00 m³
Connections
8,000
Wastewater Production Capacity
5,600.00 m³/day
Created 16 Aug 2026, 17:19
· Last updated 16 Aug 2026, 17:19