Ongoing
Unknown
Approved
Consulting Services for the Preparation of Detailed Designs and Tender Documents, Assistance to PEA in Tendering and Contracting and Construction Supervision
Kisii · Nyaribari Chache · Kitutu Central, Kisii Central, Bobaracho
Overall Progress
5.00%
Project Overview
Implementing Agency
Lake Victoria South Water Works Development Agency
Programme
Support to Wastewater Management at Lake Victoria South
Start Date
09 May 2024
Planned End
11 Jan 2028
Actual End
-
Contractor
-
Consultant
CES/MIBP
Location Type
Urban
Target Areas
Kitutu Central, Kisii Central, Bobaracho
Scope of Works
Water Supply: • Replacement of 31 km old / dilapidated pipes & appurtenances. • Extension of water reticulation system,
Impacts
Improved sanitation; Improved hygiene; Reduced water-borne diseases; Increased coverage to portable piped water supply
Key Challenges
Frequent blockages in sewers due to solid waste deposition in sewer chambers (Poor management of solid wate); Sewer lines passing through private lands & properties; Encroachment of sewer wayleaves in some areas; Existing sewer lines that have not been connected to clients
Remarks
Project ongoing smoothly; Works Contract expected to be signed before January 2029
GPS Coordinates
0°40'20.14"S, 34°46'11.45"E
Funding Sources
Gok
🇰🇪 Domestic
· Grant
KES 6.7M
Total
KES 6.7M
Beneficiaries
5,000
Households
25,000
Population
Technical Specs
Distribution Lines
62.40 km
Connections
9,970
Wastewater Production Capacity
3,500.00 m³/day
Wastewater Treatment Capacity
3,500.00 m³/day
Trunk Sewer Main
7.00 km
Reticulation Sewer
35.00 km
Manholes
500
Sewer Connections (Households)
1,800