Construction of Watamu Sewerage System and Waste Water Treatment plant project
- · - · -
Overall Progress
0.00%
Project Overview
Implementing Agency
Coast Water Works Development Agency
Programme
GOK Funded Projects
Start Date
-
Planned End
-
Actual End
-
Contractor
-
Consultant
-
Location Type
-
Scope of Works
• New Waste Water Treatment Plant (Waste Stabilization Ponds) comprising of Inlet Works, Anaerobic Ponds, Facultative Ponds, Maturation Ponds & Sludge Drying Beds
• Reticulation 25 km sewer Sewerage Network within the service area of Watamu urban centre, Trunk Sewers connecting the Reticulation sewer with the New Waste Water Treatment Plant, pipeline sizes ranging between DN 150-450
• Sewage Pumping Stations at localized low points along the Sewerage Network,
• Administration building with laboratory and Store,
• Guard House and Grade 9 Staff Houses,
• Associated Ancillary Works e.g. Access roads, water reticulation, drainage etc.
Remarks
Awaiting Budgetary Allocation
Upon completion 6,000 households will be connected
Funding Sources
No funding sources recorded.
Total
KES 0.0M
Beneficiaries
1,200
Households
6,000
Population