Report Back to Projects
Completed Pipeline extension Approved

Pipeline Replacement, Extension and Augmentation (Primary, secondary, tertiary & service mains), Bulk meters and consumer connections – Short-term phase (2017-2020) in Watamu

- · - · -

Overall Progress
100.00%
Project Overview
Implementing Agency
State Department for Water and Sanitation
Programme
Water & Sanitation Development Project (WSDP)
Start Date
02 Oct 2021
Planned End
-
Actual End
-
Contractor
Blue Swift Contractors Limited
Consultant
Design Master Plan in JV with Studio Galli Ingegnera (SGI)
Location Type
Urban
Scope of Works
Watamu Town 50mm diameter to 200mm diameter HDPE and Ferrous Water Pipelines, approx. total length 21km. Supply of Pipes and Fittings for approximately 700 Consumer Water Connections to be carried out by the Water Company. Reconnection of Existing Consumers previously connected to old water mains to the New Distribution Network – approximately 300 Consumers.
Impacts
>Protection of public health >Environmental preservation (through a Managed water supply system) >Access to Education for girls > Economic benefits from employment (operation and maintenance staff) >Healthy and sustainable community due to improved quality of life (through more comfortable and dignified living environment) >Revenue generation from the water bills payments
Key Challenges
>Cash flow challenges due to extended disbursement procedures
Remarks
Physical works completed DLP ended on 30th December 2024 Project operational
Funding Sources
Wb
🌍 Foreign · Loan
KES 226.0M
Total KES 226.0M
Beneficiaries
2,260
Households
11,300
Population
Technical Specs
Treated Water Mains 21.00 km
Connections 700