Water Projects

1699 project(s) found

Filters
Reset
entries
# Project Name County Constituency Target Areas Programme Status Progress Total Cost (KES) Actions
1301 Chumet Water Supply Baringo
Churo Amaya
Baringo North Chumet and adjoining areas GoK Directly Funded Projects Completed
100.00%
KES 14.3M
1302 Bekibon Water Supply Project Baringo
Tenges
Baringo Central Bekibon and adjoining areas GoK Directly Funded Projects Ongoing
5.00%
KES 9.0M
1303 Kiambereria Water Project Nakuru
Turi
Molo Kiambererian and adjoining areas GoK Directly Funded Projects Ongoing
75.00%
KES 19.7M
1304 Lorengipi Borehole Turkana
Lokiriama-Lorengkippi
Loima Nakadwara location, Lorengipi boys Equalization Fund Project Phase ll Ongoing
90.00%
KES 7.7M
1305 Kalokol Water Project Turkana
Kalokol
Turkana Central Wadach, Lobotoo, Ngabeiyatunga, Nap... Equalization Fund Project Phase ll Ongoing
80.00%
KES 72.6M
1306 Ewoi Akinyor Borehole Turkana
Katilia
Turkana East Ewoi Akinyor and adjoining areas Equalization Fund Project Phase ll Ongoing
50.00%
KES 7.6M
1307 Londopua Borehole Turkana
Lobokat/Kainuk
Turkana South Lodoupua and Kakong area Equalization Fund Project Phase ll Ongoing
40.00%
KES 9.7M
1308 Lomunyenkirion Borehole Turkana
Kokuro
Turkana South Lomunyenkirion and adjoining areas Equalization Fund Project Phase ll Completed
100.00%
KES 12.3M
1309 Ngaukon Borehole Turkana
Nakalale
Turkana North Ngaukon and adjoining areas Equalization Fund Project Phase ll Completed
100.00%
KES 7.8M
1310 Narengewoi (Nalekan) Borehole Turkana
Lake zone
Turkana North Narengewoi and adjoining arease Equalization Fund Project Phase ll Completed
100.00%
KES 9.5M
County Overview
Loading…
Loading…

Fetching entity performance details…